济南市木兰倾城装饰工程教您水电装置的6个基本常识 来源:http://www.m6hosting.com 日期:2018-10-30 发布人:admin

济南市木兰倾城装饰工程教您水电装置的6个基本常识
Ji'nan Mulan city decoration project teaches you 6 basic knowledge of hydropower installations.
1.水管管道开槽
1. water pipe slotting
施工办法.先弹线再开槽。管路开槽按照要求必定要事平行线或许笔直线,比方有水电施工图的对照施工图更好一些。需求平行走线的管道有必要控制在60-90厘米高的地方,有水龙头的管道有必要是笔直的。深度控制在四厘米左右。线槽开好之后施工人员必定要记好开槽管路的尺度以及方位。便利后期洁具装置时断定管路的具体方位。
Construction method. First, play the line and then slotting. Pipeline grooving must be done in parallel or straight lines, as required, better than a hydroelectric construction drawing with a reference to the construction drawings. Pipelines requiring parallel alignment must be kept at 60-90 centimeters high and pipes with taps must be straight. The depth control is about four centimeters. After the line is opened, the construction personnel must record the size and orientation of the slotting pipeline. Facilitate the later stage sanitary ware device to determine the specific location of the pipeline.
2.水管管道装置
2. water pipe installation
装饰资料要求.PPR管.铝塑管。三年前很多人都喜爱运用铝塑管,这两年运用PPR管比较多。管道有分为冷水管和热水管两种,暗藏的管道绝对不可以用镀锌铁管。
Decorative materials require.PPR pipe. Aluminum plastic pipe. Three years ago, many people liked to use aluminum plastic pipes. In the past two years, there were more PPR pipes. There are two kinds of pipes: cold water pipes and hot water pipes. Hidden pipes must not be galvanized iron pipes.
施工图水路功用不合理的话,必定要与业主交流并添加水路的运用功用。
If the waterway function of the construction drawing is unreasonable, it is necessary to exchange with the owner and add the function of the waterway.
3.水管管道检查
3. water pipe inspection
水路管道检查是至关重要的,这影响到今后的水路安全隐患问题。咱们常常选用试压的办法来检查管道是否有渗漏现象。试压是检查办法之一,先选用堵头将一切的内丝堵住,之后用压力表镇压试水。镇压之后检查一切的管道以及接头方位是否有漏水现象。另一种办法就是堵上之后,翻开水阀二天二夜,第三天来检查一切的接头方位检查是否有漏水状况。
Water pipeline inspection is very important, which will affect the future safety problems of waterways. We often use pressure test to check whether there is leakage in the pipeline. Pressure test is one of the inspection methods. Choose a plug to plug all the inner wires, then use pressure gauge to suppress water test. After checking, check whether all pipes and joints are leaking. Another way is to open the valve two days and two nights after plugging, the third day to check all the joint position to see if there is any leakage.
济南装饰公司
4.二次防水
4. two times waterproof
水路管道装置之后,用水泥砂浆混合封好卫生间一切的线槽。比及线槽与地上干透之后,再次清洁地上以及墙面,墙面水分干透后就可以做防水了,墙面防水应该高达一米。假如卫生间背面有家具或许家电的话,有必要做满墙。以防家具受潮,地上在做好防水之后需求填渣。填渣十厘米以上的用水泥砂浆干混来铺填。做二次防水地上与墙面应该一同做。
After the water pipes are installed, all the grooves in the bathroom will be sealed with cement mortar. Compared with the groove and the ground dry, clean the ground and the wall again, the wall can be waterproof after the water is dried, the wall waterproof should be as high as one meter. If there is furniture or appliances on the back of the bathroom, it is necessary to make full walls. In order to prevent furniture from dampness, the ground needs to be filled with slag after waterproofing. Fill the slag ten cm or more with cement mortar dry mixed to fill. Do two waterproofing floors and walls should be done together.
5.电线线路开槽
5. wire line slotting
济南装饰公司的施工人员在与业主商量好用电功用以及要求后,与电工师傅来交底,弹好平行与笔直的线槽。安顿好开关插座之后,插座应该在离地上40厘米的方位开槽,壁挂空调插座应该间隔地上2.2米的方位开槽,开关间隔地上1.2-1.4米的方位开槽。开关插座配合装置要弹水平线来开槽。卫生间需求结合运用功用来进行弹线开槽。
Jinan decoration company's construction personnel in consultation with the owners of electricity and requirements, and the electrician to come to the bottom, play a parallel and straight line groove. After installing the switch socket, the socket should be slotted 40 cm above the ground, the wall-mounted air-conditioning socket should be slotted 2.2 meters above the ground, and the switch should be slotted 1.2-1.4 meters above the ground. The switch socket fitting device must play the horizontal line to slotting. Bathroom requirements combined with the use of work for the elastic line slotting.
6.电线电路布线
6. wire wiring
资料的挑选要求.2.5-6平方米的铜芯线.16毫米以上的线管。布线要求:大部分电工师傅在电路电线布线中,没有考虑到强电与弱电.开关.空调插座和电器插座需求分开走线。因而开槽也可以节约很多的费用。强电与弱电布线要求应该相隔30厘米,空调专用插座为6平方以上的电线分组,电器专用插座为4平方的电线,开关则为2.5平方的专用分组。空调线间隔地上2米的方位走线。电器线在地上走线,开关以及照明体系的线组在墙面或许顶面走线。开关插座在装置的时分有必要是水平或许笔直的,这样使得后边的面板装置更加平坦。厨房的开关以及插座有必要结合橱柜的运用功用来进行归纳安置与装置。因而电线在安置好之后,施工工人记载好线路的安置以及安排尺度,这样便利后期各种装饰品以及家具的装置。
The selection of data requires.2.5-6 square meters of copper core wire.16 mm above the line pipe. Wiring Requirements: Most electricians do not consider the separate wiring of strong and weak electricity, switches, air conditioning sockets and electrical sockets in circuit wiring. So slotting can save a lot of money. Strong and weak wiring requirements should be 30 cm apart, air conditioning socket for more than 6 square wire grouping, electrical socket for 4 square wire, switch for 2.5 square special grouping. The air conditioning line is 2 meters away from the ground. The electrical wiring is on the ground, the switch and the line of lighting system are on the wall or the top. Switch sockets must be horizontal or straight when the device is installed, so that the rear panel device is more flat. Kitchen switches and sockets must be combined with the use of cabinet work for inductive placement and installation. Therefore, after the wire is installed, the construction workers record the placement of the line and the arrangement of the scale, so as to facilitate the later various decorations and furniture devices.
本文由济南市木兰倾城装饰工程奔驰彩票APP下载http://www.m6hosting.com整理,对济南装饰公司感兴趣的朋友可以关注我们的栏目,我们将为您提供更多装饰知识.
This article is organized by Jinan Mulan Qingcheng Decoration Engineering Co., Ltd. http://www.m6hosting.com. Friends interested in Jinan Decoration Company can pay attention to our column. We will provide you with more decorative knowledge.