济南装饰公司通知你年后装修开工,一定要晓得5大要点 来源:http://www.m6hosting.com 日期:2019-03-04 发布人:admin

济南装饰公司通知你年后装修开工,一定要晓得5大要点
Jinan Decoration Company notifies you that the renovation will start after one year, and you must know five main points.
1.做足预备任务
1. Make adequate preparations
提早选好合适本人的装修公司
Choose a suitable decoration company in advance
选择装修公司的时分可以从装修公司的设计.施工.售后.效劳等多方面思索,假如工夫富余,可以选择观赏装修公司现有工地,这是比拟能表现一个装修公司施工程度的。因而,选择适宜.效劳好.信誉好的装修公司,才干防止装修闹心。
When choosing the decoration company, we can think from the design, construction, after-sales and service of the decoration company. If we have spare time, we can choose the existing site of the decoration company. This is comparable to the degree of construction of a decoration company. Therefore, the selection of appropriate, good service and good reputation of decoration companies, ability to prevent decoration annoyance.
2.确保施工衔接良好
2. Ensure good connection of construction
装修公司的工人一年究竟活动性比拟大,年前和年后的能够会有比拟大的变卦。所以在停工前要反省工人能否有改换,如有改换,新工人对工程工序能否清楚,否则会形成施工衔接上的成绩。
Decoration company workers in a year after all activity is comparable, before and after the year can have a comparatively large change of fortune. Therefore, before stopping work, it is necessary to reflect on whether workers can be replaced, and if so, whether the new workers can be clear about the engineering process, or else they will form achievements in the construction connection.
3.年后施工墨守成规
3. Follow the rules in construction after a year
由于每家的工地施工进度不同,停工后的侧重点也个不相反,不同的工序完成之后又有什麼需求留意的?
Due to the different construction progress of each site, the emphasis is not the same after the shutdown. What needs to be noticed after the completion of different processes?
1.木工竣工
1. Completion of Wood Works
如木工年前曾经竣工,年后的侧重点即便反省木工有无变化,假如发现木料无形.开裂的成绩要及时修复。如没有成绩就可以重新打磨了一下再涂上油漆。
If the woodworking was completed before, the emphasis after the year should be repaired in time, even if the woodworking has changed, if it is found that the wood is invisible. If there is no result, you can re-polish it and then paint it.
2.油瓦竣工
2. Oil tile completion
油瓦工普通都会在年前竣工,假如瓦工真实做不完,也要保证单个房间的墙壁和空中全部贴完。年后停工时经过一段工夫的复工,温度湿度发作了变化,瓷砖能够会发作空鼓变化。
Oil bricklaying is usually completed before the year, if the bricklaying can not be completed, it is also necessary to ensure that the walls and air of a single room are all pasted up. After a year's shutdown, after a period of time, the temperature and humidity changed, and the tiles could change empty drum.
济南装饰公司
3.收尾阶段
3. Ending Stage
木工.油工.瓦工全部做完后,只剩铺地板.装洁具五金件等收尾任务,在装置地板时,留意预留足够的伸缩缝,防止木板因热胀冷缩挤压变形。在装置洁具.家电.家具时,留意维护根底面以及产品,避免刮花或碰伤。
After all carpentry, oiler and tile work is finished, there are only finishing tasks such as floor laying, fittings, hardware and so on. When installing the floor, pay attention to reserving enough expansion joints to prevent the wood board from being deformed by thermal expansion, cold contraction and extrusion. When installing sanitary ware, household appliances and furniture, pay attention to the maintenance of the bottom and products, to avoid scratching or bruising.
4.留意及时避开梅旱季节
4. Pay attention to avoid the drought season in time
年后停工装修,应该赶早不赶晚。假如装修任务不断拖迁延拉,工夫一长就会碰上梅旱季节,给施工带来更多的费事。
After a year, we should stop work and renovate as soon as possible. If the decoration task is constantly delayed and delayed, a long time will encounter the drought season, which will bring more trouble to the construction.
年后装修除了要留意合理布置好工夫,更要留意施工质量。依照施工流程对工地停止反省,看看已竣工的工程能否存在成绩以便及时修复。
In addition to paying attention to the reasonable layout of the decoration after the year, we should pay more attention to the construction quality. In accordance with the construction process, stop introspecting the site to see if the completed project can have achievements in order to repair in time.
五.不要焦急赶工
5. Don't rush to work
春节之前确定好装修方案,到年后装修工人回来下班之时,就可以间接开工,保证装修顺畅。年后开工不久能够赶到装修淡季,不用一味敦促施工人员放慢进度。由于施工进度与工序应该严厉依照项目的工艺要求停止,诸如刷腻子.铺地砖.做防水等都必需留出足够的枯燥工夫,否则当前很容易呈现成绩。
Before the Spring Festival, the decoration plan should be determined. When the decoration workers return to work after the year, they can start indirectly to ensure smooth decoration. Shortly after the start of the project, the off-season decoration can be reached, without blindly urging the construction personnel to slow down the pace. Because the construction progress and process should be strictly in accordance with the technical requirements of the project, such as putty brushing, floor tile paving, waterproofing and so on, we must set aside enough tedious work, otherwise it is easy to present results at present.
想了解更多济南装饰公司知识,欢迎关注我们的公司网站:http://www.m6hosting.com谢谢支持!
To learn more about Jinan Decoration Company, please pay attention to our website: http://www.m6hosting.com. Thank you for your support!